Security built into a facility from the first drawing, not bolted on after the concrete is poured.
Once a perimeter is poured, a vital area is walled in, or a control room's cable routing is finalised, the cost — and difficulty — of correcting a security gap rises sharply. Security by Design (SeBD) exists to prevent that: embedding physical protection into a facility's planning and engineering from the earliest stages, rather than retrofitting it once construction is complete.
GTS supports owners, developers, and national authorities through exactly this process — for new nuclear power programs, nuclear weapons program facilities, and critical infrastructure builds more broadly, including energy, utilities, and transportation assets.
Regulatory frameworks reflect this reality directly. In the United States, 10 CFR 73.55 requires that a nuclear power reactor's physical protection program be fully implemented before fuel is allowed onsite — meaning the detection, delay, and response capability all need to exist and be tested before that construction milestone, not after.
Physical protection embedded into planning from the earliest design stage, not retrofitted after construction.
US regulation requires the protection program operational years before a plant reaches that construction milestone.
Resolving conflicts between protective measures and safety requirements while they're still just drawings.
The same discipline applies to critical infrastructure new-builds broadly: energy, utilities, and transportation.
Why Timing Matters
What We Deliver
GTS advisors join new-build programs as early as the client's own planning allows — ideally at conceptual design — and work alongside architects, structural engineers, and safety teams rather than reviewing their work after the fact.
Where a program is already under construction and security wasn't fully considered at design stage, GTS also supports remediation: identifying which gaps can still be addressed cost-effectively before completion, and which will require compensatory procedures once operational.